
For installation contractors
Everything you need to prepare, quote and deliver poured-in-place (wetpour) surfacing projects: quantity calculator, installation guidance, technical data sheets and remote technical support from our team.
Un client hésite sur les couleurs ou l’épaisseur ? Envoyez-lui le configurateur de sol : il compose son projet et vous le transmet.
Terraludis supplies the materials and remote technical support. You stay in charge of the installation and of your relationship with your client.
Calzado granulate, EPDM granules and SBR, PU binders, bonding primer and smoothing agent: every component of the system.
Terms reserved for our partner installation contractors.
To show the colours to your clients and approve shades before work starts.
Installation protocol, technical data sheets and advice by phone or video call, before and during your projects.
An impact-absorbing surface is only as good as its installation. The thicknesses and mix ratios given by the calculator are a starting point: the installer adjusts them on site according to the base, the temperature and the humidity.
The base must be clean, dry, sound and free of dust. On concrete or asphalt, apply the bonding primer. Check the evenness: every hollow means extra material. Plan edgings or a clean edge so the surface finishes neatly.
Avoid installing in the rain, on a damp base or in very hot weather. Recommended conditions: 5–30 °C, with the base at least 3 °C above the dew point.
Weigh the granules and binder for every batch, never by eye. Mix until every granule is evenly coated. Only prepare what you can lay before the binder starts to cure.
Screed to the target thickness using level guides. Close the surface without over-compacting: material pressed too hard loses impact absorption.
Trowel the top layer onto the base layer: 10 mm for Calzado (15 mm for cork). The technical smoothing agent helps achieve a closed, even surface. Take care with the joints between batches to avoid visible marks.
About 8 h for the surface and 24 h right through before use, depending on the temperature.
The stated fall heights are test values. They do not replace an HIC test after installation, in accordance with EN 1177.
Composition, binder ratios, fall heights and installation advice for Calzado, as a PDF.
Download →Are you an installation contractor? Work with us.
Trade terms for installers, samples, colour chart and remote technical support on your projects.
Become a partner installer